KB-127163: Configuring a comparison

Configuring a comparison

When comparing the current data from backups with the previous backup, it is important to note if any changes have been made. You will see if the program running on the PLC has been changed or not. The current values (such as the amount of produced, motor temperature, etc.) need to be excluded from the comparison to ensure that only program changes are recorded.

Note

Excluding current values or lines from the comparison, does not exclude them from the backup. Please bear in the mind that depending on the server settings for backups, it is possible that only a new backup will be created if differences are detected during the comparison.

Excluding current values from the comparison:

  1. Start the AdminClient.
  2. Go to Jobs.
  3. Select the component whose current values you want to exclude from the job.
  4. Select the job that you want to edit.
  5. Activate the option Enable configuration of job-specific compare.
  6. Click on Comparison configuration.
  7. Select the RSLogix 5000 project.
  8. When excluding a routine, enter first of all your name into the routine field and select whether you also want to exclude or include your subfolder from the comparison.
  9. Enter the name of the variable, whose current values you want to be excluded from the comparison.
  10. By default, trends are excluded. If you do not want these to be excluded, clear the checkbox.
  11. Click on OK.RSLogix5000_Jobs_Compare_Configuration.pngImage: Comparison configuration
  12. Save the changes to the job.

Last update: September 15, 2023

Related Articles

IMPRINT | PRIVACY POLICY | COOKIE POLICY

Privacy Preference Center